Description
Purpose of the receiving bridge.
The receiving Luge-wheeled bridge allows to move the bridge on a platform by means of a towbar of freight transport without use of crane equipment.
The receiving Luge-wheeled bridge allows to move the bridge on a platform by means of a towbar of freight transport without use of crane equipment.
Characteristic | Index |
---|---|
Working load, t | 40 |
Chassis type | Sled-wheel |
Number of wheels of chassis, pieces | 2 |
Track: of wheel axle, mm | 1418 |
Track: of sled axle, mm | 2150 |
Road clearance, not less: of wheel axle, mm | 400 |
Road clearance, not less: of sled axle, mm | 255 |
Speed of motion in hitch, km/h | 30 |
Total weight, not more, t. | 4,5 |