At Yarudeyskoye field, the construction of a solution-salt node is underway.
At the moment the capacity of preparation of APS 25-00 solution is established. This unit was developed in cooperation with the design Institute of oil and gas, and is a vertical cylindrical container equipped with a paddle mixer.
Applied the latest development, four times reduces the preparation time of the solution.
The unit is equipped with a transfer pump, complete with customer requirements.
The installed pump can be domestic or imported, explosion-proof and no, corrosion-resistant or non-corrosion-resistant.