Steam unit is designed to produce steam used for steaming the wellhead and auxiliary equipment for steaming tubing and drill pipes for heating preventers, process tanks and other equipment used in the production of capital and workover in cold and temperate climatic regions.
SPECIFICATIONS
The working volume of the reservoir into the water ...................... 2 m3
Operating under the diesel fuel tank capacity ............... 0.3 m3
Operating temperature ............................. -40 ... +40 0C
Steam output .................................. 100 kg / h
Steam temperature .............................. 115 0C
Thermal power .......................................... 70 kW
Diesel fuel consumption, max ...................... 7.8 l / h
Feasibility study of the application of the ПГУ-01
compared to mobile steam type setting ППУ 1600 (when the clock works)
parameter | ППУ 1600 | ПГУ-01 |
fuel consumption |
30 l / h |
8 l / h |
fuel consumption |
30 l / h |
8 l / h |
Staff costs | 4 people 160 000 rubles / month |
additional staff |
The cost of water treatment (scale inhibitors) |
8 rubles / ton of steam 12.8 rubles / hour 2 200 rubles / month |
water conditioning not needed |
TOTAL operating costs |
800 000 rubles / month | 170 000 rubles / month |
The cost of installing | from 3.5 million rubles | 1 million rubles |
Save money by purchasing ПГУ-01 about 2.5 million rubles.
The economic effect of steam generator installation ПГУ-01 compared to the steam generating unit ПГУ 1600, excluding the cost of the equipment is 630 000 rubles a month.
The payback period of the ПГУ-01 less than 2 months (!)